You are here: home   Blogs   The GOAT Blog   Transmission: The missing link in the renewables revolution
The GOAT Blog

Transmission: The missing link in the renewables revolution

Document Actions
Tip Jar Donation

Your donation supports independent non-profit journalism from High Country News.

Enter amount:

$
Jonathan Thompson | Jan 23, 2013 05:00 AM

You want to cut carbon to the levels recommended by the International Panel on Climate Change? Then you’ll need 100,000 Megawatts of new renewable power integrated into the electrical grid. And in order to get that, you’ll need a lot -- try 25,000 miles -- of new high voltage transmission lines.

That was the message Gary Graham, of Western Resource Advocates, was pushing at a recent conference on clean energy and transmission in Denver, Colo. Graham wasn’t alone. One speaker and panelist after another, from former Colo. Gov. Bill Ritter to the National Resource Defense Council’s Carl Zichella, repeated the message in various forms: We must expand, upgrade and rethink our current electrical grid in order to put solar and wind on par with coal and natural gas in our energy mix.

Nevada Powerlines

While the entire national grid needs attention, our distinct piece of that grid -- the Western Interconnect -- is perhaps the most challenging. Its 100,000 miles of high voltage transmission lines were mostly built to ship power from big coal and hydroelectric plants (generators) to population centers (loads). Now, the capacity in those power lines is, for the most part, already reserved. And the lines don't necessarily stretch into the areas where big wind and solar potential exists.

Parts of Central and Eastern New Mexico, for example, are primed for turbines. The winds there are of a high grade, the land is mostly owned by drought-stricken farmers and ranchers, who yearn for the revenues turbines on their land would bring, and environmental impacts aren’t a huge issue. The turbines have yet to sprout like weeds, however, because there’s no way to get the power to where it’s needed.

That’s in part because transmission lines are still one of the most difficult energy projects to realize. The proposed Sun-Zia line, for example, which would stretch from central New Mexico to Phoenix, would need the go-ahead from several jurisdictions. The transmission line builder would also have to deal with both New Mexico and Arizona regulators, who have the power to nix the deal. In 2007, for example, Arizona regulators shut down a proposed power line because they worried that exporting power to California would raise their state’s prices. While the Federal Energy Regulatory Commission could step in in such an instance and force a natural gas line through, it has no such power with transmission lines. And in the West, there’s no regional transmission planning authority with any sort of power. While many renewables advocates would like to see a more empowered FERC, they also acknowledge that giving more power to powerlines is a tough sell in the West -- both private property advocates and environmentalists worry about the feds forcing transmission down their throats.

Environmentalists are protesting Sun-Zia because they don’t want 200-foot towers to cut through wild lands, particularly the San Pedro River valley. That the lines carry green power is little comfort: Given the nature of the grid, and laws that mandate open access to transmission, it’s impossible to say that fossil fuel-generated power will never travel the line, as well. Landowners are not keen on power lines crackling over their houses. In California, a line that would carry wind power from near Tehachapi to the Los Angeles area has been held up by strong resistance from the well-to-do community of Chino Hills.

Clearly, the folks at the conference have a hard row to hoe. Brian Parsons, of the National Renewable Energy Laboratories, said that his organization believes it is possible for the nation to get 80 percent of its electricity from renewables by 2050. But to get there will require billions of dollars of investment -- not to mention navigating the arduous, years-long permitting process -- in new transmission each year until then. Determining how to expand, retrofit and upgrade the current fossil fuel-centric electric grid to accommodate all those renewables will be one of the biggest challenges facing utilities and policymakers in coming years.

The good news is that there are things can be done while waiting for the big new transmission projects to get off the ground. The way the grid is operated can be changed to better “geographically smooth” intermittent renewable power sources. We can adopt new ways of marketing power, to make the current grid more flexible. And, as Zichella pointed out, renewable power can catch a ride on transmission lines that are getting a bit of extra space thanks to coal-fired power plant retirements.

The grid is wonderfully and terribly complex, and throwing in solar and wind makes it even more so. I’ll be diving into this complexity in future issues of this blog and the HCN magazine. So stay tuned.

Photo: Powerlines in Nevada, by the author.

Jonathan Thompson is a senior editor at High Country News. His Twitter handle is @jonnypeace.

Colin  Holloway
Colin Holloway
Jan 23, 2013 10:31 AM
Sure would be nice if there was more encouragement to those who might chose to not hook up to the grid.
I produce all of my own electricity with photovoltaics.
Not freezing in the dark by any measure.
I've got the nice big 220 pump and the washing machine and all that groovy stuff, right down to the table saw.

Personally I think that the belief in maintaining the current system of long distance transmission is as outdated as coal fired power plants.
Regardless of alternative sources the new paradigm is going to require many more sources of generation, simply because renewables aren't amenable to singular mass electrical production. Multiple sources create phase feedback. The concept is simple in AC generation, there is a wave form created, off/on, if you wish. When these wave forms are out of sync you're going to have problems. The more sources of generation the more chaos you throw into things.
"They're" working on it. I sure wish "they" were spending as much resources on simplifying small home & community system simplicity and,
most critically, long lasting batteries.

Never did make sense to me how and why we tie up the earth with these power lines all over the place. Especially out here in the west. Sure seems like a huge waste to allow for the inevitable waste of energy lost in transmission from those distances traveled and then to bust the juice down to house current.
To this kid it seems as stupid as coal fired plants.

There are several and obvious drawbacks to small, home owner systems. They're like pets and require attention. Batteries are a real pain. Still, I think if we were to put as much energy into promoting small as we do large that we'd be a heck of a lot closer to working solutions.
Mary McBee
Mary McBee Subscriber
Jan 24, 2013 07:49 AM
Absolutely right, Colin. In our country, attention is relentlessly kept on BIG systems because that's where BIG corporations make their BIG money, and that's where they want focus to remain. I have long wondered why environmental organizations have not taken this obvious issue on BIG time. Perhaps because there are no BIG donations behind that cause? Mary McBee in Iowa
Carol Overland
Carol Overland
Jan 28, 2013 08:08 AM
You might want to check how much Western Resource Advocates and NRDC are being paid to promote transmission! Transmission is not the answer -- mindful siting is. One need look no further than the San Luis transmission line. There's no reason they can't build fields of solar near the Pueblo coal plant, and could probably take one of them off line. Colorado has a typical situation of gas plants and transmission already existing to support wind, and it just needs to be sited there. But wait, Xcel Energy and other transmission owners have realized that transmission is a major revenue producer, getting rates of over 12% return on equity in a time where those rates are three times prime! No new transmission. It's a revenue scam and locks us into central station power, a/k/a coal.
Carol Overland
Carol Overland
Jan 28, 2013 08:12 AM
Here's the Energy Foundation site with a "transmission" key word search: http://hgrants.ef.org/?sector[]=5c997f164b1871440c09e3c762eccfd9&begin=2009-01-01&end=2013-01-28&filter=transmission&on=description&sort=begin&order=asc
Roger Faulkner
Roger Faulkner
Feb 05, 2013 07:00 PM
The key ting that is needed is a technology to move big powerlines underground. For technical reasons, only DC lines can run underground for long distances. Cables will never be able to carry the needed power levels. What is needed is a form of "electricity pipeline," something I've been working on for years (www.elpipe.com)

Email Newsletter

The West in your Inbox

Follow Us

Follow us on Facebook! Follow us on Twitter! Follow our RSS feeds!
  1. In the field with a Montana couple hunting wolves | Amid bitter controversy over allowing hunters and ...
  2. Seeking balance in Oregon's timber country | Can logging towns and old-growth forests both thri...
  3. How right-wing emigrants conquered North Idaho | Conservative transplants largely from California h...
  4. Save our gauges | Important USGS stream gauges imperiled by austerit...
  5. (Still) getting the lead out | When will hunters stop poisoning condors with ammu...
  1. Don't mess with the Forest Service | How a determined and feisty Forest Service held of...
  2. Sacrificial Land: Will renewable energy devour the Mojave Desert? | An unlikely group of activists is championing a ne...
  3. How right-wing emigrants conquered North Idaho | Conservative transplants largely from California h...
  4. The Forest Service battles placer mining with an obscure law | A little-known 1955 law gives the Forest Service a...
  5. How technology detected a huge mine landslide before it happened | Employees at a Kennecott copper mine outside Salt ...
More from Energy
BLM fracking rules just got more industry-friendly Feds weaken a proposal that many enviros say wasn’t strong enough in the first place
Rooftop solar is killing your utility! But don't write a eulogy yet
Wyoming's pile of coal The story of the state's 10-billionth ton
All Energy

Most recent from the blogs

 
© 2013 High Country News, all rights reserved. | privacy policy | terms of use | powered by Plone | site by Groundwire | design by Ryan Foster

HCN Logo High Country News in your inbox!


Sign up now to receive our weekly email newsletter!

• The best weekly collection of Western environmental news

• An at-a-glance look at our latest news and analysis


This box was designed to only appear once. It uses a "cookie" (a small file stored on your computer) to remember that it has shown the box to you.

If you are seeing this box appear multiple times, then something is not allowing the cookie to be stored properly. Browsers can be set to not allow cookies, and some people choose to disallow cookies for security reasons. If your browser is setup this way, please consider adding "www.hcn.org" as an exception to your no-cookies rule. For information about how to do this, just search the Web for "browser cookie exceptions."

If you're sure this isn't the problem, then it could be related to how your browser has stored information from our site in previous visits. Browsers often "cache" images, text and other website content in order to make them appear faster if you ever go back. Sometimes the browser's cache can be corrupted or become outdated. The simplest fix for this is to try reloading the page. If that doesn't fix the problem, it may be necessary to clear your temporary items from your browser. Again, a web search will provide you with lots of options and instructions.

Either way, we're sorry to hear that this box is getting in the way of your enjoyment of the HCN website. If you continue to have trouble, please contact our Subscriber Services team.