Washington nuke plant has unsafe welds

 

A welding engineer with the Washington Public Power Plant Supply System says the plant has structural problems that could cause costly delays. Download entire issue to view this article: http://www.hcn.org/issues/14.24/download-entire-issue

High Country News Classifieds