Images from Disposable workers of the oil and gas fields
back to the article
by JT Thomas
Ninety-foot lengths of drill pipe are pulled from the well hole and stacked on the rig. It takes a well-coordinated heave-ho from the “derrick man” up in the “crow’s nest” and the roughneck on the drill platform to swing them safely into position






